Suppliers Are Materialmen, and Most Must Serve the Notice
Florida's lien law calls a supplier a materialman: a person who furnishes materials under contract to the owner, contractor, subcontractor, or sub-subcontractor on the site of the improvement or for direct delivery to the site, or specially fabricated materials off the site for the particular improvement, and who performs no labor in the installation. §713.01(21).
A materialman who is not in privity with the owner claims a lien under Fla. Stat. §713.06 and must serve a Notice to Owner as a prerequisite to perfecting the lien and recording a Claim of Lien. §713.06(2)(a). That includes a supplier who sells directly to the contractor. Privity with the contractor does not remove the obligation to notify the owner.
A materialman who is in privity with the owner claims under §713.05 and is not required to serve a Notice to Owner. §713.05.
Who Gets the Notice, by Customer
Section 713.06(2)(a) adds recipients as the supplier moves further from the owner:
- Supplier to the contractor: serve the owner
- Supplier to a subcontractor: serve the owner, and serve a copy on the contractor as a prerequisite to perfecting the lien
- Supplier to a sub-subcontractor: serve the owner, serve a copy on the contractor as a prerequisite to perfecting the lien, and serve the subcontractor if the supplier knows the subcontractor's name and address
- Any supplier: serve a copy on any additional person the owner designated in the Notice of Commencement (§713.06(2)(b))
The Deadline
The notice must be served before commencing, or not later than 45 days after commencing, to furnish materials, and in any event before the owner's disbursement of the final payment after the contractor has furnished its final payment affidavit. §713.06(2)(a). The time requirements must be strictly complied with. §713.06(2)(f).
For specially fabricated materials, the notice generally must be served before fabrication begins or within 45 days after actual fabrication begins, and in any event before the owner's final payment. Preliminary design work and submittals are not fabrication, and delivery to the jobsite does not postpone the 45 days. §§713.01(14), 713.06(2)(a); Stunkel v. Gazebo Landscaping Design, Inc., 660 So. 2d 623, 625 n.2 (Fla. 1995); Oolite Industries, Inc. v. Millman Construction Co., 501 So. 2d 655, 656 (Fla. 3d DCA 1987).
The date of service is determined under §713.18. A notice mailed by one of the postal methods in §713.18(2) within 40 days after first furnishing, properly addressed and supported by the required postal records, is effective on the date of mailing.
Suppliers on open accounts should serve the notice with the first order for the project. The owner is under no obligation to a lienor, other than a laborer, from whom it has not received a Notice to Owner at the time it makes a payment. §713.06(3)(c)1.
Rental Equipment, and Suppliers to Suppliers
Furnishing materials includes supplying rental equipment, but does not include supplying handtools. §713.01(14). For rental equipment, final furnishing means the date the equipment was last on the site of the improvement and available for use. §713.01(12).
A supplier to another supplier has no lien. A materialman qualifies as a lienor only if it contracts with the owner, a contractor, a subcontractor, or a sub-subcontractor, and no other person may have a lien. §713.01(19).
Public Projects Use a Different Notice
No lien attaches to public property. On a public project under §255.05, a supplier who is not in privity with the contractor must serve the contractor with written notice that it intends to look to the bond, before commencing or not later than 45 days after commencing to furnish, and must later serve a sworn Notice of Nonpayment, no earlier than 45 days after its first furnishing and no later than 90 days after its final furnishing. §255.05(2)(a)2. Not every public project has a payment bond. A supplier who sold directly to the contractor is in privity with it, and those two notices are required only of claimants who are not.
Frequently Asked Questions
Does a material supplier need to send a Notice to Owner in Florida?
Yes, if the supplier is not in privity with the owner. Fla. Stat. §713.06(2)(a) makes the notice a prerequisite to perfecting a lien and recording a Claim of Lien. A supplier who contracts directly with the owner claims under §713.05 and does not serve one.
Does a Florida supplier to a subcontractor serve the contractor too?
Yes. A materialman to a subcontractor must serve a copy of the notice on the contractor as a prerequisite to perfecting a lien. A materialman to a sub-subcontractor must do the same and must also serve the subcontractor if it knows the subcontractor's name and address. §713.06(2)(a).
Can a supplier to a supplier file a lien in Florida?
No. Under §713.01(19), a materialman is a lienor only if it contracts with the owner, a contractor, a subcontractor, or a sub-subcontractor, and no other person may have a lien.
Does equipment rental carry lien rights in Florida?
Yes. Section 713.01(14) defines furnishing materials to include supplying rental equipment, though not handtools. The rental company follows the materialman rules, including the Notice to Owner where it is not in privity with the owner.
Related Florida Resources
Explore other critical compliance areas for Florida construction mechanic lien law.
Notice Requirements
Statutory preliminary notice obligations for private works, private payment bonds, and public works bond claims under Florida law
Mechanic Lien Deadlines
Mechanic Lien recording requirements, 90-day filing deadline, statutory form, and mechanic lien amount limitations
Mechanic Lien Enforcement Deadlines
Foreclosure deadlines, Notice of Contest, bond claim suit timelines, and public works enforcement
Florida Mechanics Lien Forms
Every notice, lien, release, and bond claim form used in Florida
Florida Lien Waivers
Statutory waiver forms, waiver types, and enforceability rules in Florida
Florida Overview
Return to the main Florida construction mechanic lien law page